ONEOK NGL PIPELINE LP

hazardous_liquid Incident — — February 25, 2010

Incident Information

Incident DateFebruary 25, 2010
OperatorONEOK NGL PIPELINE LP
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates36.66590, -97.88460

Cause

CauseINCORRECT OPERATION
SubcausePIPELINE OR EQUIPMENT OVERPRESSURED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$966,352
Emergency Response$3,000
Other Costs$0

Location Map

Incident Narrative

OPERATOR WAS ISOLATING PIPELINE GATHERING SYSTEM AT DELIVERY POINT WHICH REQUIRED SHUTDOWN OF INJECTION FACILITIES. CONTROLLER FAILED TO FOLLOW SYSTEM SHUT DOWN PROCEDURES WHICH CAUSED AN OVERPRESSURE ON SECTION OF PIPELINE WHICH RESULTED IN A PIPELINE RUPTURE. RUPTURE OCCURRED AT POINT OF A PREVIOUS MECHANICAL DAMAGE (GOUGE/DENT COMBINATION). PROCEDURES FOR ISOLATING THE PIPELINE GATHERING SYSTEM HAVE BEEN REVIEWED AND PIPELINE CONTROLLERS HAVE BEEN RETRAINED ON PROCEDURES.