ONEOK NGL PIPELINE LP
hazardous_liquid Incident — — July 14, 2010
Incident Information
| Incident Date | July 14, 2010 |
| Operator | ONEOK NGL PIPELINE LP |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 36.77451, -97.75519 |
Cause
| Cause | CORROSION FAILURE |
| Subcause | INTERNAL CORROSION |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $7,700 |
| Emergency Response | $0 |
| Other Costs | $0 |
Location Map
Incident Narrative
ONEOK PLANT OPERATOR DISCOVERED VAPORS RELEASE FROM THE LINE 1 STATIONARY PROVER IN THE MEDFORD YARD. THE PROVER WAS ISOLATED AND DEPRESSURED. THE PROVER HAS BEEN REMOVED FROM SERVICE AND THE ENCLOSURE WILL BE REPLACED.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.