"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — February 2, 2011

Incident Information

Incident DateFebruary 2, 2011
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.89600, -75.35860

Cause

CauseNATURAL FORCE DAMAGE
SubcauseLIGHTNING

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$3,200
Other Costs$0

Location Map

Incident Narrative

"ON FEBRUARY 2, 2011 AT 7:00AM, THE LOCAL FIRE DEPARTMENT WAS NOTIFIED OF A SMALL FIRE BY A PASSERBY. THE FACILITY IS A SHARED FACILITY BETWEEN BUCKEYE AND ANOTHER OPERATOR. THE FIRE DEPARTMENT RESPONDED AND NOTIFIED THE OTHER OPERATOR WHO IN TURN NOTIFIED BUCKEYE. BUCKEYE INITIATED EMERGENCY REPONSE PROCEDURES. THE FIRE DEPARTMENT EXTINGUISHED THE SMALL FIRE WITH A HANDHELD FIRE EXTINGUISHER. AFTER THE FIRE WAS EXTINGUISHED, BUCKEYE PERSONNEL ISOLATED THE DAMAGED FITTING AND CONDUCTED CLEANUP ACTIVITIES. THE AFFECTED PIPELINE WAS NOT OPERATING AT THE TIME OF THE INCIDENT. THE DAMAGED FITTING AND TUBING HAS BEEN REMOVED AND REPLACED AND HAS BEEN PLACED BACK INTO NORMAL OPERATION. AN INVESTIGATION HAS DETERMINED THE PROBABLE CAUSE TO BE AN ELECTRICAL SURGE CAUSED BY A NEARBY LIGHTNING STRIKE WHICH DAMAGED THE DIELECTRIC FITTING. ALL CLEANUP ACTIVITIES HAVE BEEN COMPLETED. NO FURTHER REMEDIATION OR CLEANUP IS REQUIRED. *SUPPLEMENTAL ANSWERED PART E 5F"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.