PLANTATION PIPE LINE CO

hazardous_liquid Incident — — January 21, 2010

Incident Information

Incident DateJanuary 21, 2010
OperatorPLANTATION PIPE LINE CO
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates30.78251, -90.75851

Cause

CauseNATURAL FORCE DAMAGE
SubcauseTEMPERATURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$85,000
Emergency Response$105,000
Other Costs$0

Location Map

Incident Narrative

THE PUMPING STATION IS AN UNMANNED FACILITY. IT APPEARS THAT THE 2-INCH DRAIN VALVE ON THE MDG 18-INCH PIPELINE BLOCK VALVE WAS COMPROMISED DURING RECENT FREEZING WEATHER. PRODUCT DRIPPED FROM THE DRAIN VALVE INTO A CONCRETE CONTAINMENT BASIN UNDERNEATH THE BLOCK VALVE. THE PRODUCT THEN FLOWED DOWN A PVC DRAIN LINE AND INTO THE FACILITY'S CATCHMENT BASIN. NO PRODUCT WAS RELEASED FROM THE CATCHMENT BASIN. THE DRAIN TO THE CONTAINMENT BASIN WAS PARTIALLY BLOCKED WITH DEBRIS WHICH CAUSED WATER AND GASOLINE TO OVERFLOW DURING A SIGNIFICANT RAIN EVENT AND THE PRODUCT WAS RELEASED ONTO THE LAND SURFACE IN THE IMMEDIATE VICINITY OF THE BLOCK VALVE. THE PRODUCT APPARENTLY MIGRATED THROUGH THE SUBSURFACE AND ALONG ONE OF THE FACILITIES PIPELINES AND WAS DISCHARGING INTO A SHALLOW ROADSIDE DITCH LOCATED IMMEDIATELY EAST OF THE FACILITY WHERE THE PIPELINES EXIT THE FACILITY. PRODUCT WAS OBSERVED IN THE SHALLOW DITCH FOR A DISTANCE OF APPROXIMATELY 300 FEET SOUTH OF WHERE IT WAS DISCHARGING INTO THE DITCH.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in