KOCH PIPELINE COMPANY, L.P.

hazardous_liquid Incident — — June 4, 2010

Incident Information

Incident DateJune 4, 2010
OperatorKOCH PIPELINE COMPANY, L.P.
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates45.67299, -94.59392

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$3,000
Emergency Response$7,600
Other Costs$3,000

Location Map

Incident Narrative

THE TEFLON RING SEAT ON A ONE INCH CLOSED VALVE FAILED. THE SEAT WAS LOCATED AT THE END OF THE THREADS WHERE THE TWO PIECE FNW STEEL THREADED BALL VALVE WAS PUT TOGETHER. THE VALVE WAS RATED FOR 2000 PSI. THE ONE INCH VALVE WAS PLUGGED TO THE OUTSIDE AND ON THE INSIDE THREADED INTO A FOUR INCH NIPPLE INTO A THREADOLET THAT WAS WELDED TO THE TOP OF THE SUCTION PIPE TO UNIT 3 AT ALBANY STATION.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in