KINDER MORGAN WINK PIPELINE LP

hazardous_liquid Incident — — February 3, 2012

Incident Information

Incident DateFebruary 3, 2012
OperatorKINDER MORGAN WINK PIPELINE LP
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.47285, -102.89311

Cause

CauseINCORRECT OPERATION
SubcauseOTHER INCORRECT OPERATION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$2,000
Emergency Response$26,000
Other Costs$12,000

Location Map

Incident Narrative

THE MOTOR ON THE 3RD PARTY PUMP EXCEEDED THE MAXIMIUM RPM CAPACITY OF THE PUMP. THE PUMP WAS EQUIPPED WITH PULSATION DAMPENERS WHICH WERE NOT FUNCTIONING. THESE CONDITIONS LEAD TO EXCESSIVE VIBRATION ON KM'S PIPELINE. KM REQUIRED THE 3RD PARTY PUMP OPERATOR TO REPAIR THE CONDITIONS THAT LED TO THE VIBRATION BEFORE RECONNECTING THE 3RD PARTY EQUIPMENT. THESE CORRECTIVE ACTIONS HAVE BEEN COMPLETED BY THE 3RD PARTY PUMP OPERATOR.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in