"ENBRIDGE ENERGY, LIMITED PARTNERSHIP"

hazardous_liquid Incident — — February 17, 2012

Incident Information

Incident DateFebruary 17, 2012
Operator"ENBRIDGE ENERGY, LIMITED PARTNERSHIP"
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates41.49806, -87.51722

Cause

CauseOTHER OUTSIDE FORCE DAMAGE
SubcauseOTHER OUTSIDE FORCE DAMAGE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$53,360
Other Costs$0

Location Map

Incident Narrative

"ON FEBRUARY 17, WHILE INVESTIGATING AN ANOMALY ON LINE 6A MP 461 DURING AN INTEGRITY DIG, DRY OIL RESIDUE WAS OBSERVED INSIDE THE CASING PIPE. FURTHER INVESTIGATION SHOWED EVIDENCE THAT THERE WAS A PIECE OF METAL IN CONTACT WITH THE CARRIER PIPE. THE LINE WAS IMMEDIATELY SHUT DOWN TO INVESTIGATE. WHAT IS BELIEVED TO BE A TOOTH FROM THE BORING MACHINE WAS DISCOVERED IN CONTACT WITH THE CARRIER PIPE CAUSING A DENT APPROXIMATELY 9 INCHES IN LENGTH. THE DEFECT WAS SLEEVED ON FEBRUARY 18 AND THE LINE WAS RETURNED TO SERVICE."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in