MARATHON PIPE LINE LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorMARATHON PIPE LINE LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates38.82805, -90.08571

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

A BLEEDER VALVE WAS LEFT OPEN DURING A PROJECT TO REMOVE A CHECK VALVE AT ROXANA WOODPAT STATION. THE VALVE WAS BEING USED TO MAKE SURE PRESSURE WAS NOT BUILDING ON THE STATION PIPING THAT HAD BEEN DRAINED TO REMOVE A CHECK VALVE. AFTER VALVE WORK WAS COMPLETE AND LINE WAS BEING REFILLED (RECOMMISSIONED), THE LEAK WAS DISCOVERED. THE VALVE WAS IN THE INCORRECT POSITION FOR NORMAL OPERATIONS. MPL EMPLOYEE DID NOT ADHERE TO THE PROCEDURE LEADING TO THE INCORRECT OPERATION DURING MAINTENANCE EVENT.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in