ONEOK NGL PIPELINE LP
hazardous_liquid Incident — — July 21, 2010
Incident Information
| Incident Date | July 21, 2010 |
| Operator | ONEOK NGL PIPELINE LP |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 30.45372, -94.97393 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | NON-THREADED CONNECTION FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $15 |
| Emergency Response | $120 |
| Other Costs | $0 |
Location Map
Incident Narrative
ONEOK FIELD REPRESENTATIVE WAS NOTIFIED BY PIPELINE CONTROL OF A POTENTIAL VAPOR RELEASE AT SHEPHERD BOOSTER. UPON ARRIVING AT BOOSTER EMPLOYEE DISCOVERED THE O-RING ON THE P3 FLUSH FILTER VESSEL CLOSURE HAD FAILED. O-RING WAS REPLACED.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.