"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — April 23, 2012

Incident Information

Incident DateApril 23, 2012
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates40.60851, -74.24000

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$1,060
Other Costs$0

Location Map

Incident Narrative

"ON 4/23/12 AT 15:10, A LOCAL EMPLOYEE NOTICED A MIST COMING FROM THE 607L PRE-FILTER DIFFERENTIAL GAUGE. THE EMPLOYEE IMMEDIATELY CLOSED A VALVE THAT ISOLATED THE GAUGE. ALL PROPER NOTIFICATIONS WERE MADE, AND THE LOCAL OSRO WAS CALLED TO ASSIST WITH THE CLEANUP. ALL FREE PRODUCT WAS COLLECTED BY VAC TRUCK, AND ALL AFFECTED SOIL WAS REMOVED. ALL CLEANUP AND REMEDIATION ACTIVITIES ARE COMPLETE. IT WAS DETERMINED THAT THE O-RING AROUND THE GAUGE FACE HAD FAILED. THE GAUGE WAS REPLACED AND NORMAL OPERATION RESUMED. *SUPPLEMENTAL ANSWERED PART E 5F"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in