COLONIAL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorCOLONIAL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.85836, -94.97929

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT APPROXIMATELY 11:15 A.M. CST ON NOVEMBER 8, 2010, AN OPERATOR FOUND A RAINBOW DISCOLORATION ON STANDING WATER AROUND THE LINE 1 CEDAR BAYOU INJECTION\DELIVERY VALVE AND A SHEEN IN AN ACCESS WELL. THE OPERATIONS MANAGER WAS NOTIFIED AT 11:30 A.M. AND HE NOTIFIED THE DIRECTOR OF OPERATIONS AT 11:50 A.M. CONTRACTORS ARRIVED AT APPROXIMATELY 1:30 P.M. AND BEGAN EXCAVATING AROUND THE VALVE AND COLLECTING THE POOLED WATER. THE FOLLOWING DAY THE INSULATING JOINT WAS IDENTIFIED AS THE SOURCE OF THE RELEASE AND WAS REPAIRED ON NOVEMBER 12TH. DURING THE EXCAVATION PROCESS, APPROXIMATELY 52.5 CUBIC YARDS OF SOIL WERE REMOVED TO DETERMINE THE SOURCE OF THE RELEASE AND ESTABLISH A SUITABLE AREA TO COMPLETE THE REPAIR. APPROXIMATELY 226.7 BBLS OF WATER AND 15 GALLONS OF PRODUCT WERE RECOVERED AND 4.2 GALLONS OF PRODUCT WERE CALCULATED TO HAVE EVAPORATED AND 0.21 GALLONS IN THE CONTAMINATED SOIL. THE ACCIDENT DID NOT MEET STATE REPORTING REQUIREMENTS. A NATIONAL RESPONSE CENTER NOTIFICATION WAS MADE ON 1-10-2011 WHEN IT WAS DETERMINED THAT THE ESTIMATED TOTAL COSTS WOULD EXCEED $50,000.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in