BUCKEYE PARTNERS, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorBUCKEYE PARTNERS, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates40.61145, -74.23725

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 12:07 PM ON DECEMBER 6, 2010, BUCKEYE'S LOCAL OPERATING PERSONNEL OBSERVED SOME STAINED SOIL IN THE AREA OF AN UNDERGROUND WATER DRAW LINE FOR TANK 97 IN THE LINDEN, NEW JERSEY TANK FARM. THE WATER DRAW LINE WAS ISOLATED AND EMERGENCY RESPONSE PROCEDURES WERE INITIATED. ALL APPROPRIATE EXTERNAL NOTIFICATIONS WERE MADE. THE 4"" WATER DRAW LINE WAS EXCAVATED AND A TEMPORARY REPAIR CLAMP WAS INSTALLED ON DECEMBER 7, 2010. THE DAMAGED PIPE HAS BEEN REMOVED AND WAS REPLACED WITH CERTIFIED PIPE ON DECEMBER 17, 2010. THE CAUSE OF THE RELEASE HAS BEEN DETERMINED TO BE INTERNAL CORROSION. ALL CONTAMINATED SOIL HAS BEEN REMEDIATED AND NO FURTHER ACTION IS NEEDED. *SUPPLEMENTAL UPDATED PART C 3 ANSWERED PART E 5F

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in