"PLAINS PIPELINE, L.P."

hazardous_liquid Incident — — September 18, 2012

Incident Information

Incident DateSeptember 18, 2012
Operator"PLAINS PIPELINE, L.P."
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.13575, -102.18757

Cause

CauseCORROSION FAILURE
SubcauseINTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$40,000
Emergency Response$3,000
Other Costs$0

Location Map

Incident Narrative

"ON SEPTEMBER 18, 2012, WHILE PERFORMING THE MORNING INSPECTION OF THE MCCAMEY TANK FARM, THE OPERATOR DISCOVERED A RELEASE AT 06:30. NOTIFICATIONS TO THE CONTROL CENTER WERE MADE AND BY 06:40 THE SEGMENT OF 16-INCH SUCTION LINE FROM THE MANIFOLD TO THE ODESSA 16-INCH PUMPS HAD BEEN SHUTDOWN AND ISOLATED. THE PIPE WAS EXPOSED AT THE RELEASE SITE, INSPECTED AND A PRELIMINARY DETERMINATION BY OPERATIONS PERSONNEL THAT THE RELEASE WAS POSSIBLY CAUSED BY INTERNAL CORROSION. A TEMPORARY REPAIR WAS MADE ON THE LINE. THE LINE WAS THEN INSPECTED, RESTARTED AND PLACED BACK IN SERVICE. THE CAUSE OF THIS RELEASE IS STILL UNDER INVESTIGATION. THE PIPE WILL BE SENT TO A LAB TO BE ANALYZED FOR THE CAUSE OF FAILURE. A SUPPLEMENTAL WILL BE SUBMITTED ONCE THE RESULTS ARE RECEIVED. THIS SEGMENT WILL BE REPLACED. SUPPLEMENTAL NARRATIVE: THE METALLURGICAL ANALYSIS RESULTS DETERMINED THAT THE CAUSE WAS INTERNAL CORROSION DUE TO MICROBIOLOGICALLY-INFLUENCED CORROSION (MIC) AT THE 6 O'CLOCK POSITION. VISUAL EXAMINATION SHOWED CORROSION PITS PENETRATED THE PIPE WALL, THE MORPHOLOGY OF THESE PITS WAS CHARACTERISTIC OF MIC. THE METALLOGRAPHIC EXAMINATION SHOWED THAT THE CORROSION PITTING IN THE PIPE EXHIBITED UNDERCUTTING, WHICH IS ALSO CHARACTERISTIC OF MIC. THIS SEGMENT IS IN THE PROCESS OF BEING REPLACED."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.