EXXONMOBIL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorEXXONMOBIL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates45.65549, -108.75724

Cause

CauseNATURAL FORCE DAMAGE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

1. IN REFERENCE TO PART A9 AND D5B, ESTIMATE OF THE RELEASE WAS CHANGED TO 1509 BBLS. ON 1-19-12 2. IN REFERENCE TO SECTION B12, EMPCO WAS UNABLE TO DETERMINE THE WATER DEPTH AT THE LOCATION OF THE ACCIDENT. THE CLOSEST GAUGE DOWNSTREAM MEASURED 13.91 FT. 3. IN ADDITION TO THE FBE COATING THE PIPE HAS A 1 INCH CONCRETE ""SKIN"" FOR ABRASION R

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in