NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.

hazardous_liquid Incident — — July 19, 2011

Incident Information

Incident DateJuly 19, 2011
OperatorNUSTAR PIPELINE OPERATING PARTNERSHIP L.P.
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates42.05314, -96.04389

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseDESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$2,000
Emergency Response$1,500
Other Costs$0

Location Map

Incident Narrative

A PIN HOLE WAS FOUND IN A CIRCUMFERENTIAL WELD BELOW VALVE 7-15. A CLAMP WAS INSTALLED AND A PERMANENT REPAIR SLEEVE WAS WELDED OVER THE AFFECTED AREA.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in