PLANTATION PIPE LINE CO

hazardous_liquid Incident — — October 20, 2011

Incident Information

Incident DateOctober 20, 2011
OperatorPLANTATION PIPE LINE CO
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates33.45542, -84.40389

Cause

CauseEQUIPMENT FAILURE
SubcauseOTHER EQUIPMENT FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$100
Emergency Response$1,000
Other Costs$31,500

Location Map

Incident Narrative

ON THURSDAY OCT 20TH, O&M PERSONNEL CHANGED FILTERS ON THE PIPE LINE SERVING THE ATLANTA AIRPORT. THREE (3) FILTER VESSELS WERE INVOLVED IN THE WORK, WARNER LEWIS FILTER VESSELS #1, #2 AND #3. THE WORK ON THE VESSELS BEGAN AT 09:00 (EDT). EACH VESSEL WAS ISOLATED AND DRAINED FOR THE WORK. THE PIPE LINE WAS NOT RUNNING AT THIS TIME. THE WORK LASTED UNTIL 12:00PM (EDT). AFTER COMPLETING THE CHANGE OUT OF FILTERS, THE O&MS SECURED EACH VESSEL AND REFILLED THEM WITH TANK HEAD PRESSURE, CHECKED FOR LEAKS AND RETURNED THE PIPE LINE BACK TO THE CONTROL CENTER FOR NORMAL OPERATIONS. THE O&MS THEN LEFT FOR LUNCH. AT 12:59 PM (EDT) THE CONTROL CENTER STARTED THE PIPE LINE BOOSTER AND AT 13:15 (EDT) THE PIPE LINE MAIN LINE UNIT WAS STARTED. O&M PERSONNEL RETURNED FROM LUNCH AND NOTED PRODUCT SPRAYING FROM FILTER VESSEL #1 PRESSURE WARNING DEVICE (PWD), LOCATED AT THE BOTTOM OF THE DOOR OF THE VESSEL AND CONTACTED THE CONTROL CENTER TO SHUT THE LINE DOWN AT 13:37 (EDT). THE O&M PERSONNEL ISOLATED THE VESSEL, CONTACTED THEIR SUPERVISOR AND BEGAN CONTAINMENT AND CLEANUP OPERATIONS. THE AREA SUPERVISOR CONTACTED ADDITIONAL PIPE LINE PERSONNEL AND CONTRACT PERSONNEL TO ASSIST WITH CONTAINMENT AND CLEANUP EFFORTS.