KOCH PIPELINE COMPANY, L.P.

hazardous_liquid Incident — — December 11, 2011

Incident Information

Incident DateDecember 11, 2011
OperatorKOCH PIPELINE COMPANY, L.P.
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates32.29488, -97.13418

Cause

CauseEQUIPMENT FAILURE
SubcauseDEFECTIVE OR LOOSE TUBING OR FITTING

Casualties

Fatalities0
Injuries0

Costs

Property Damage$65
Emergency Response$600
Other Costs$0

Location Map

Incident Narrative

THE KPL EMPLOYEE ARRIVED ON SITE ON 12/11/11 AT 20:00 HOURS AND FOUND THE TUBING FITTING FOR THE SEAL FLUSH LINE ON PUMP #2 AT THE HILLSBORO PUMP STATION LEAKING. THE FITTING LEAKED APPROXIMATELY TEN GALLONS OF JET FUEL ONTO THE PUMP SKID AND APPROXIMATELY THREE GALLONS OF JET FUEL REACHED THE GROUND. KPL EMPLOYEE REPLACED THE TUBING AND FITTINGS, USED ABSORBANT MATS TO ABSORB ALL OF THE JET FUEL ON THE PUMP SKID, SHOVELED UP AND REMOVED ALL OF THE CONTAMINATED SOIL. THE PUMP WAS PURGED AND CHECKED FOR LEAKS. THEL KPL EMPLOYEE REPLACED THE PUMP BACK INTO OPERATION AT 23:23 HOURS ON 12/11/11 AND CHECKED FOR LEAKS.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in