PHILLIPS 66 PIPELINE LLC

hazardous_liquid Incident — — May 17, 2013

Incident Information

Incident DateMay 17, 2013
OperatorPHILLIPS 66 PIPELINE LLC
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates36.13518, -95.63705

Cause

CauseINCORRECT OPERATION
SubcauseEQUIPMENT NOT INSTALLED PROPERLY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

"DURING COMMISSIONING OF A NEW PIPE REPLACEMENT PROJECT, THE VALVE BODY CAVITY RELEASE DEVICE FITTING WAS FOUND TO BE LOOSE. PIPELINE WAS SHUT DOWN AND ALL VALVE BODY RELEASE FITTINGS ON THE NEW PIPE REPLACEMENT WERE CHECKED. THIS WAS CHANGED ON 5/12/2014 TO REFLECT OPERATOR ERROR DUE TO INCORRECT INSTALLATION."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in