ONEOK NGL PIPELINE LP

hazardous_liquid Incident — — January 12, 2012

Incident Information

Incident DateJanuary 12, 2012
OperatorONEOK NGL PIPELINE LP
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates34.52110, -96.62351

Cause

CauseEQUIPMENT FAILURE
SubcauseDEFECTIVE OR LOOSE TUBING OR FITTING

Casualties

Fatalities0
Injuries0

Costs

Property Damage$30
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

ONEOK EMPLOYEE ARRIVED AT ONEOK PONTOTOC STATION TO RESET VIBRATION ALARM AND DISCOVERED PRODUCT LEAKING FROM A CRACK IN THE 3/8"" STAINLESS STEEL TUBING THAT CONNECTS THE PUMP MANIFOLD TO THE PUMP CASE PRESSURE TRANSMITTER. TUBING WAS ISOLATED AND REPLACED. THE CAUSE OF THE CRACK AT THE FITTING IS UNDETERMINED. ONEOK HAS SINCE PROVIDED TRAINING TO FIELD EMPLOYEES ON THE PROPER TECHNIQUES FOR INSTALLING FITTINGS ON STAINLESS STEEL TUBING. THIS REPORT WAS RECREATED ON 1/29/2019 AS IT WAS INADVERTENTLY OVERWRITTEN IN THE DATABASE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in