KOCH PIPELINE COMPANY, L.P.

hazardous_liquid Incident — — January 26, 2012

Incident Information

Incident DateJanuary 26, 2012
OperatorKOCH PIPELINE COMPANY, L.P.
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates44.64213, -90.95776

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseDESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$264,734
Emergency Response$300
Other Costs$0

Location Map

Incident Narrative

WHILE PERFORMING A ROUTINE MAINTENANCE EXCAVATION ON 1/26/12 TO EXPOSE A BURIED 6"" PROPANE PIPELINE FROM AN IN-LINE INSPECTION TOOL RUN, SMALL BUBBLES WERE DISCOVERED COMING FROM THE SOIL. ONCE THE PIPELINE WAS FULLY EXPOSED, THE SOURCE APPEARED TO BE A PINHOLE IN THE PIPELINE CAUSING A RELEASE FROM THE DOWNSTREAM PART OF A WELD+ENDS. AT THIS LOCATION THERE WERE A PAIR OF WELD+ENDS SEPARATED BY 13 FEET OF CONNECTING PIPE. THE RELEASE WAS LOCATED ON THE UPSTREAM WELD+ENDS. THE RELEASE WAS SO SMALL NO VAPOR CLOUD FORMED. THE MAINTENANCE EXCAVATION WAS LOOKING FOR 2 DENTS THAT WERE SEVERAL FEET AWAY FROM BOTH WELD+ENDS AND THE 13 FEET OF CONNECTING PIPING. PIPELINE WAS IN A NORMAL SCHEDULED SHUTDOWN PRIOR TO THE TIME THE RELEASE WAS DISCOVERED AND PRESSURES WERE STABLE WITHIN A NORMAL OPERATING RANGE. BOTH WELD+ENDS WITH THE 13 FEET OF CONNECTING PIPE WERE REMOVED. THE INVESTIGATION HAS BEEN COMPLETED AND THE CAUSE OF THE RELEASE WAS FROM FILLET WELDING (NO BEVELED EDGE) THAT DID NOT COMPLETELY CLOSE UP ON THE END OF THE WELD+ENDS. AS OF MAY 23, 2014, KOCH PIPELINE COMPANY, L.P. (KPL) IS STILL WAITING FOR AGENCY CLOSURE. PURSUANT TO THE ""INSTRUCTIONS (REV 12-2012) FOR FORM PHMSA F 7000-1 (REV 12-2012)"", KPL WOULD LIKE TO APPLY TO FILE A FINAL REPORT. THE PROVISION ON PAGE 5 UNDER SUPPLEMENTAL REPORT STATES, ""IN CASES WHERE AN ACCIDENT RESULTS IN LONG-TERM REMEDIATION, AN OPERATOR MAY CEASE FILING SUPPLEMENTAL REPORTS IN THE FOLLOWING SITUATIONS AND, INSTEAD, FILE A FINAL REPORT EVEN WHEN ADDITIONAL REMEDIATION COSTS AND RECOVERY OF RELEASED COMMODITY ARE STILL OCCURRING: 1. WHEN THE ACCIDENT RESPONSE CONSISTS ONLY OF LONG-TERM REMEDIATION AND/OR MONITORING WHICH IS BEING CONDUCTED UNDER THE AUSPICES OF AN AUTHORIZED GOVERNMENTAL AGENCY OR ENTITY.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in