"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — August 8, 2013

Incident Information

Incident DateAugust 8, 2013
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates42.10430, -75.99560

Cause

CauseCORROSION FAILURE
SubcauseINTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,360
Emergency Response$15,360
Other Costs$0

Location Map

Incident Narrative

"AT APPROXIMATELY 10:50 EDT ON AUGUST 8, 2013, DURING A ROUTINE INSPECTION, A BUCKEYE OPERATOR NOTICED GASOLINE SEEPING FROM THE 3 O'CLOCK POSITION OF THE SCRAPER TRAP DOOR OF THE 751 LINE AT THE BINHAMPTON TERMINAL IN VESTAL NY. THE CONTROL CENTER WAS NOTIFIED AND THE 751 LINE WAS IMMEDIATELY SHUT DOWN. ALL INTERNAL NOTIFICATIONS AND EXTERNAL NOTIFICATIONS WERE MADE ACCORDING TO COMPANY PROCEDURES. INITIAL CLEANUP EFFORTS INCLUDED DIVERTING THE PRODUCT TO THE SUMP AND THE USE OF SORBENT PADS. THE TRAP WAS ISOLATED FROM THE MAIN LINE. THE 751 LINE WAS RETURNED TO SERVICE ON AUGUST 9, 2013 AT 10:22. THE QUANTITY OF THE RELEASE IS ESTIMATED TO BE 2.5 BARRELS. THE ESTIMATED AMOUNT OF PRODUCT RECOVERED IS APPROX. 2.5 BARRELS. NO FURTHER REMEDIATION IS REQUIRED."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in