"BUCKEYE PARTNERS, LP"
hazardous_liquid Incident — — August 13, 2013
Incident Information
| Incident Date | August 13, 2013 |
| Operator | "BUCKEYE PARTNERS, LP" |
| Commodity | REFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 40.60522, -74.23907 |
Cause
| Cause | INCORRECT OPERATION |
| Subcause | "VALVE LEFT OR PLACED IN WRONG POSITION, BUT NOT RESULTING IN A TANK, VESSEL, OR SUMP/SEPARATOR OVERFLOW OR FACILITY OVERPRESSURE" |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $0 |
| Emergency Response | $2,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"AT 14:55 ON AUGUST 13, 2013 DURING THE RETURN TO SERVICE OPERAT TANK 91 WALK AROUND, A BUCKEYE OPERATOR NOTICED TRANSMIX SPRAYING OUT OF A 1/2"" OPENED VALVE THAT IS LOCATED DIRECTLY BEHIND A 6"" VALVE. TANK FILLING OPERATIONS WERE IMMEDIATELY STOPPED. ALL INTERNAL AND EXTERNAL NOTIFICATIONS WERE MADE ACCORDING TO COMPANY PROCEDURES AND POLICIES. INVESTIGATIONS REVEALED THAT THE BUNG WAS NOT PROPERLY CLOSED ON THE 1/2 VALVE. THE VALVE BUNG WAS CLOSED AND FILLING OPERATIONS RESUMED. ALL CONTAMINATED PRODUCT WAS REMOVED. NO ADDITIONAL REMEDIATION IS REQUIRED"