KINDER MORGAN CO2 CO. LP
hazardous_liquid Incident — — April 6, 2012
Incident Information
| Incident Date | April 6, 2012 |
| Operator | KINDER MORGAN CO2 CO. LP |
| Commodity | CO2 (CARBON DIOXIDE) |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 33.03138, -102.82777 |
Cause
| Cause | INCORRECT OPERATION |
| Subcause | WRONG EQUIPMENT SPECIFIED OR INSTALLED |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $2,911 |
| Emergency Response | $0 |
| Other Costs | $0 |
Location Map
Incident Narrative
THERMAL RELIEF VALVE AT SHEEP MOUNTAIN STATION PREMATURELY RELIEVED ON APRIL 6, 2012. RELIEF VALVE WAS SET AT 2,625 PSIG. PUMP STATION WAS OPERATING BELOW RELIEF VALVE SET PRESSURE. RELIEF VALVE WAS SPECIFIED WITH INCORRECT SEAT MATERIAL DURING PRE-CONSTRUCTION PHASE. THE VALVE WAS REPLACED WITH THE CORRECT SEAT MATERIAL.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.