ONEOK NGL PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorONEOK NGL PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates33.59202, -96.38146

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

THE PIPELINE WAS ISOLATED AND APPROXIMATELY 80 FT OF PIPE WAS REMOVED AND REPLACED WITH PRETESTED PIPE. FAIL SECTION WAS SENT OUT FOR METALLURICAL TESTING. PIPELINE WAS PURGED OF AIR AND RESTARTED. METALLURGICAL TESTING DETERMINED THAT SELECTIVE SEAM CORROSION WAS THE CAUSE OF THE FAILURE. ATTACHED IS ONEOK'S TIMELINE OF THE INCIDENT.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in