ENTERPRISE CRUDE PIPELINE LLC

hazardous_liquid Incident — — April 23, 2014

Incident Information

Incident DateApril 23, 2014
OperatorENTERPRISE CRUDE PIPELINE LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.71890, -102.21213

Cause

CauseEQUIPMENT FAILURE
SubcauseDEFECTIVE OR LOOSE TUBING OR FITTING

Casualties

Fatalities0
Injuries0

Costs

Property Damage$100
Emergency Response$2,000
Other Costs$0

Location Map

Incident Narrative

CONTROL CENTER RECOGNIZED A LINE BALANCE VARIATION AND CALCULATION AROUND 21:12 ON 4/23/2014. AFTER THE TECHNICIAN ARRIVED ON SITE AT 22:50 IT WAS CONFIRMED THAT THE DISCHARGE STAINLESS STEEL 3/8 INCH TUBING OF THE PD PUMP AT THE STATION HAD FAILED. THE STATION WAS ISOLATED FROM THE C15 LINE AND TUBING WAS REPLACED AND STATION PUT BACK INTO SERVICE 4/24/14 10:30. EXCESSIVE VIBRATION ON THIS 3/8 INCH TUBING RESULTED IN THE TUBING LEAK. PREVIOUS SUPPORT HAD BEEN EXCAVATED AROUND THE AREA DURING A REMEDIATION AND CLEAN-UP OF PREVIOUS SOIL CONTAMINATION. TUBING WAS REPLACED WITH STAINLESS STEEL BRAIDED HOSE TO ABSORB AND ELIMINATE DIRECT VIBRATION.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in