SUNOCO PIPELINE L.P.

hazardous_liquid Incident — — September 25, 2014

Incident Information

Incident DateSeptember 25, 2014
OperatorSUNOCO PIPELINE L.P.
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates41.62263, -83.48667

Cause

CauseINCORRECT OPERATION
SubcauseOTHER INCORRECT OPERATION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$100
Emergency Response$5,000
Other Costs$0

Location Map

Incident Narrative

ON 9/25/2014 AT 08:56 THE SMALL RELEASE OCCURRED AT THE TOL5 PUMP STATION. CONTRACTOR WAS WORKING TO INSTALL BLIND FLANGES ON PIPING TO ISOLATE THE LAUNCHER TRAP FROM FLARE HEADER. CONTRACTOR ERRONEOUSLY LOOSENED FLANGE ON PRESSURIZED SIDE OF VALVE THAT WAS LOTO'D. AN SPLP EMPLOYEE WAS ON SITE FOR UNRELATED WORK ACTIVITIES AND IMMEDIATELY CONTACTED THE CONTROL CENTER AND THE PIPELINE WAS SHUT DOWN. ONCE THE AREA WAS DETERMINED TO BE SAFE FOR RE-ENTRY SPLP PERSONNEL COMPLETED THE REPAIR.