"PLAINS PIPELINE, L.P."

hazardous_liquid Incident — — January 5, 2015

Incident Information

Incident DateJanuary 5, 2015
Operator"PLAINS PIPELINE, L.P."
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates28.52579, -99.22280

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,000
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

APPROXIMATELY 1 BBL OF CRUDE OIL WAS RELEASED DUE TO A CRACK IN A 1-INCH SCHEDULE (SCH) 40 PIPE NIPPLE ON PUMP 101. PLAINS HAS INSTALLED 316 STAINLESS STEEL FITTINGS AND INSPECTED TWO OTHER PUMPS ONSITE TO ENSURE THE AUXILIARY DRAIN LINES ARE ADEQUATE.