SUNOCO PIPELINE L.P.
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | SUNOCO PIPELINE L.P. |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 35.69559, -97.59628 |
Cause
| Cause | CORROSION FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON 11/14/2013 A THIRD PARTY NOTIFIED THE CONTROL CENTER OF A POSSIBLE RELEASE ON THE ROW FROM THE DEER CREEK TO CRESENT SEGMENT OF THE NOBLE 8"" PIPELINE. THE PIPELINE WAS SHUT DOWN AND COMPANY FIELD PERSONNEL WERE DISPATCHED TO THE SITE. COMPANY PERSONNEL CONFIRMED THE RELEASE. THE FAILURE SITE WAS EXCAVATED AND A PLIDCO CLAMP WAS INSTALLED ON 11/14/2013. THE FAILED SECTION OF THE LINE SEGMENT WAS CUT OUT AND NEW PIPE WAS INSTALLED ON 11/15/2013.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.