ROSE ROCK MIDSTREAM L.P.

hazardous_liquid Incident — — January 7, 2014

Incident Information

Incident DateJanuary 7, 2014
OperatorROSE ROCK MIDSTREAM L.P.
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates40.47829, -104.43527

Cause

CauseEQUIPMENT FAILURE
SubcausePUMP OR PUMP-RELATED EQUIPMENT

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$1,000
Other Costs$0

Location Map

Incident Narrative

CONTRACTORS WERE INSTALLING INSULATION ON THE INCOMING CUSTODY METERING SKID AND ACCIDENTALLY PARTIALLY OPENED A 1"" DRAIN VALVE OFF THE PROVING LOOP JUST PRIOR TO THE METER. THIS RESULTED IN A SUMP OVERFLOW OF 2 BARRELS. THE HIGH LEVEL ALARM ON THE SUMP STARTED THE PUMP BUT THE PUMP MOTOR FAILED ON MOTOR OVERLOAD AND COULD NOT BE REMOTELY RESET. THE SUMP PUMP DID NOT HAVE AN OPEN FLOW PATH WHICH CAUSED THE MOTOR OVERLOAD.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in