PLANTATION PIPE LINE CO

hazardous_liquid Incident — — January 10, 2014

Incident Information

Incident DateJanuary 10, 2014
OperatorPLANTATION PIPE LINE CO
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates30.54774, -91.16217

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$300
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

MAINTENANCE HAD BEEN PERFORMED ON THE MDG PROVER. WHEN THE PROVER WAS BEING REFILLED SO THAT IT COULD BE RETURNED TO OPERATION, THE LEAK OCCURRED. AN INVESTIGATION OF THE LEAK EVENT REVEALED THE O-RING ON THE PROVER DOOR HAD NOT SEATED CORRECTLY.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in