ENBRIDGE ENERGY, LIMITED PARTNERSHIP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENBRIDGE ENERGY, LIMITED PARTNERSHIP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates41.51487, -87.45120

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT APPROXIMATELY 6:20 PM, PLM MANAGER WAS NOTIFIED BY LOCAL ELECTRICIAN THAT THERE WAS A RELEASE OF PRODUCT COMING FROM A STEM SEAL ON UNIT 1 DISCHARGE VALVE. PLM MANAGER ARRIVED ON SITE AT 6:25 PM AND CONFIRMED RELEASE MET REPORTING CRITERIA. THE CONTROL CENTER WAS NOTIFIED AND LINE 6B WAS SHUT DOWN AND UNIT 1 WAS ISOLATED. THE STEM SEAL WAS REPLACED AND THE LINE WAS PUT BACK INTO SERVICE THE FOLLOWING DAY. APPROXIMATELY 120 YARDS OF CONTAMINATED SOIL WAS REMOVED FROM THE RELEASE SITE.