"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident — — May 4, 2015

Incident Information

Incident DateMay 4, 2015
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates37.80410, -96.87160

Cause

CauseCORROSION FAILURE
SubcauseEXTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$20,000
Emergency Response$2,462,404
Other Costs$0

Location Map

Incident Narrative

"MAGELLAN OPERATIONS CONTROL RECEIVED SCADA/LEAK WARN ALARM OF A PRESSURE DROP ON THE #6-10"" PIPELINE FROM EL DORADO TO KANSAS CITY, AND IMPLEMENTED MAGELLAN'S CODE RED PROCEDURE, IMMEDIATELY SHUTTING DOWN OF THE LINE. FIELD PERSONNEL INVESTIGATED AND FOUND THE LINE FAILURE; SUBSEQUENT INVESTIGATION DISCOVERED THE FAILURE ON THE PIPE SEAM. THE SEGMENT OF PIPE THAT FAILED WAS REMOVED AND SENT TO A METALLURGICAL LABORATORY FOR METALLURGICAL ANALYSIS. THE FAILURE ORIGINATED AT A CRACK THAT DEVELOPED UNDER AN AREA OF SELECTIVE SEAM CORROSION. THE SELECTIVE SEAM CORROSION DEVELOPED WITHIN AN AREA OF EXTERNAL CORROSION AND HAD A MAXIMUM DEPTH OF 68-PERCENT OF PIPE WALL THICKNESS. NEW PRE-TESTED PIPE WAS INSTALLED AND THE LINE WAS SUBSEQUENTLY RETURNED TO SERVICE AT A REDUCED PRESSURE IN ACCORDANCE WITH THE TERMS OF A CORRECTIVE ACTION ORDER ISSUED BY PHMSA. APPROXIMATELY 11,095 CUBIC YARDS OF IMPACTED SOIL WAS REMEDIATED. THIS REVISED SUPPLEMENTAL-FINAL REPORT WAS FILED TO INCLUDE THE COSTS ASSOCIATED WITH THE RESTORATION OF THE SITE AND THE ADDITIONAL VOLUME OF PRODUCT RECOVERED."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in