"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — March 5, 2016

Incident Information

Incident DateMarch 5, 2016
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates40.62067, -75.57011

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,000
Emergency Response$3,000
Other Costs$0

Location Map

Incident Narrative

"AT APPROXIMATELY 17:45 ON MARCH 5, 2016 A BUCKEYE EMPLOYEE DISCOVERED GASOLINE LEAKING FROM THE SCRAPER TRAP DOOR AT GUTHSVILE JUNCTION PA. THE EMPLOYEE WAS ON SITE TO PERFORM A ROUTINE OPERATION AT THE TIME OF DISCOVERY. THE LEAK WAS STOPPED BY TIGHTENING THE SCRAPER TRAP DOOR. A SKILLET WAS INSTALLED TO ISOLATE THE TRAP FROM THE 706 SPUR LINE. NO LINES WERE SHUT DOWN AND OPERATIONS WERE NOT DISRUPTED. IT IS ESTIMATED THAT ABOUT 10 GALLONS OF GASOLINE WAS RELEASED FROM THE TRAP THE ROOT CAUSE OF THE RELEASE IS THAT THE PIG TRAP DOOR WAS NOT SECURED TO TOOL TIGHT WHEN INSTALLED"