"BUCKEYE PARTNERS, LP"
hazardous_liquid Incident — — March 5, 2016
Incident Information
| Incident Date | March 5, 2016 |
| Operator | "BUCKEYE PARTNERS, LP" |
| Commodity | REFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 40.62067, -75.57011 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | NON-THREADED CONNECTION FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $1,000 |
| Emergency Response | $3,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"AT APPROXIMATELY 17:45 ON MARCH 5, 2016 A BUCKEYE EMPLOYEE DISCOVERED GASOLINE LEAKING FROM THE SCRAPER TRAP DOOR AT GUTHSVILE JUNCTION PA. THE EMPLOYEE WAS ON SITE TO PERFORM A ROUTINE OPERATION AT THE TIME OF DISCOVERY. THE LEAK WAS STOPPED BY TIGHTENING THE SCRAPER TRAP DOOR. A SKILLET WAS INSTALLED TO ISOLATE THE TRAP FROM THE 706 SPUR LINE. NO LINES WERE SHUT DOWN AND OPERATIONS WERE NOT DISRUPTED. IT IS ESTIMATED THAT ABOUT 10 GALLONS OF GASOLINE WAS RELEASED FROM THE TRAP THE ROOT CAUSE OF THE RELEASE IS THAT THE PIG TRAP DOOR WAS NOT SECURED TO TOOL TIGHT WHEN INSTALLED"