ONEOK NGL PIPELINE, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorONEOK NGL PIPELINE, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates36.77435, -97.75656

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 8:10 AM WHILE MAKING ROUNDS THROUGH THE MEDFORD FACILITY NORTH LINE 4 PUMP YARD, ONEOK EMPLOYEE NOTICED THE OUTBOARD SEAL ON PUMP #1 BEGAN TO LEAK. PIPELINE WAS SHUT DOWN AND THE PUMP ISOLATED. PIPELINE WAS SHUT DOWN FOR APPROXIMATELY 20 MINUTES WHILE RESIDUAL PRODUCT WAS EVACUATED FROM THE PUMP. ONEOK MECHANIC'S REPLACED THE OUTBOARD SEAL ON PUMP #1 AND THE PUMP AND THE PUMP WAS PUT BACK INTO SERVICE. INSPECTION OF THE FAILED SEAL DETERMINED THE CARBON FACE HAD WORN, DUE TO NORMAL WEAR, AND CAUSED THE RELEASE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in