MARATHON PIPE LINE LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | MARATHON PIPE LINE LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 38.79380, -89.08209 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
AN MPL CONTRACTOR WAS WORKING ON THE NEW MANIFOLD WHEN HE SMELLED HYDROCARBONS AND INFORMED MPL PERSONNEL AT 13:55 ON 4/27/15. THE LINE WAS IMMEDIATELY SHUTDOWN. THE AREA WAS EXTENSIVELY EVALUATED INCLUDING WRITING AN EXCAVATION PLAN, MAKING ONE-CALLS, AND MOBILIZING CONTRACTORS. UPON EXCAVATION OF THE AREA THERE WAS NO ACTIVE LEAK DETECTED AND A PRESSURE TEST WAS PERFORMED. A SMALL LEAK WAS DISCOVERED ON THE FLANGE CONNECTION AT 01:30 ON 4/28/15.THE GASKET WAS REPLACED. APPROXIMATELY 60 YARDS OF CONTAMINATED SOIL WAS EXCAVATED FROM THE AREA SURROUNDING THE FLANGE. THE INITIAL 7000-1 REPORTED THE LOCAL DATE AND TIME OF THE ACCIDENT AS 4/28/2015 AT 01:30, SINCE THIS IS THE TIME MPL VERIFIED THIS WAS AN ACTIVE RELEASE. BASED ON THE FACT THAT AN ACTIVE RELEASE WAS DISCOVERED FOLLOWING EXCAVATION AND A PRESSURE TEST, MPL HAS CHANGED THE LOCAL DATE AND TIME OF THE ACCIDENT TO 4/27/15 AT 13:55 (PART A, QUESTION 4), THE TIME WHEN HYDROCARBON ODOR WAS REPORTED.