MAGELLAN PIPELINE COMPANY, LP
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | MAGELLAN PIPELINE COMPANY, LP |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 37.80410, -96.87160 |
Cause
| Cause | CORROSION FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
MAGELLAN OPERATIONS CONTROL RECEIVED SCADA/LEAK WARN ALARM OF A PRESSURE DROP ON THE #6-10"" PIPELINE FROM EL DORADO TO KANSAS CITY, AND IMPLEMENTED MAGELLAN'S CODE RED PROCEDURE, IMMEDIATELY SHUTTING DOWN OF THE LINE. FIELD PERSONNEL INVESTIGATED AND FOUND THE LINE FAILURE; SUBSEQUENT INVESTIGATION DISCOVERED THE FAILURE ON THE PIPE SEAM. THE SEGMENT OF PIPE THAT FAILED WAS REMOVED AND SENT TO A METALLURGICAL LABORATORY FOR METALLURGICAL ANALYSIS. THE FAILURE ORIGINATED AT A CRACK THAT DEVELOPED UNDER AN AREA OF SELECTIVE SEAM CORROSION. THE SELECTIVE SEAM CORROSION DEVELOPED WITHIN AN AREA OF EXTERNAL CORROSION AND HAD A MAXIMUM DEPTH OF 68-PERCENT OF PIPE WALL THICKNESS. NEW PRE-TESTED PIPE WAS INSTALLED AND THE LINE WAS SUBSEQUENTLY RETURNED TO SERVICE AT A REDUCED PRESSURE IN ACCORDANCE WITH THE TERMS OF A CORRECTIVE ACTION ORDER ISSUED BY PHMSA. APPROXIMATELY 11,095 CUBIC YARDS OF IMPACTED SOIL WAS REMEDIATED. THIS REVISED SUPPLEMENTAL-FINAL REPORT WAS FILED TO INCLUDE THE COSTS ASSOCIATED WITH THE RESTORATION OF THE SITE AND THE ADDITIONAL VOLUME OF PRODUCT RECOVERED.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.