"ONEOK NGL PIPELINE, LLC"

hazardous_liquid Incident — — August 30, 2016

Incident Information

Incident DateAugust 30, 2016
Operator"ONEOK NGL PIPELINE, LLC"
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates36.77417, -97.75672

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$50
Emergency Response$50
Other Costs$0

Location Map

Incident Narrative

"ON AUGUST 30TH, 2016 AT APPROXIMATELY 16:05, ONEOK EMPLOYEE BEGAN TO PRESSURE UP THE 20"" STATIONARY PROVER IN THE MEDFORD PUMP YARD. WHEN THE PRESSURE ON THE PROVER REACHED 1200 PSIG THE GASKET ON THE PROVER DOOR BEGAN TO LEAK. PROVER WAS ISOLATED AND DEPRESSURED. ONCE THE PROVER HAD BEEN DEPRESSURED, GASKET WAS REMOVED AND REPLACED WITH A NEW GASKET AND PROVER RETURNED TO SERVICE."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in