"ONEOK NGL PIPELINE, LLC"
hazardous_liquid Incident — — August 30, 2016
Incident Information
| Incident Date | August 30, 2016 |
| Operator | "ONEOK NGL PIPELINE, LLC" |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 36.77417, -97.75672 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | NON-THREADED CONNECTION FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $50 |
| Emergency Response | $50 |
| Other Costs | $0 |
Location Map
Incident Narrative
"ON AUGUST 30TH, 2016 AT APPROXIMATELY 16:05, ONEOK EMPLOYEE BEGAN TO PRESSURE UP THE 20"" STATIONARY PROVER IN THE MEDFORD PUMP YARD. WHEN THE PRESSURE ON THE PROVER REACHED 1200 PSIG THE GASKET ON THE PROVER DOOR BEGAN TO LEAK. PROVER WAS ISOLATED AND DEPRESSURED. ONCE THE PROVER HAD BEEN DEPRESSURED, GASKET WAS REMOVED AND REPLACED WITH A NEW GASKET AND PROVER RETURNED TO SERVICE."
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.