WESTERN REFINING PIPELINE, LLC

hazardous_liquid Incident — — June 30, 2015

Incident Information

Incident DateJune 30, 2015
OperatorWESTERN REFINING PIPELINE, LLC
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates35.53141, -108.21031

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$35,000
Emergency Response$10,000
Other Costs$0

Location Map

Incident Narrative

ON JUNE 30, 2015 AT 13:06 HOSPAH LEAK ALARM WAS ACKNOWLEDGED BY CONTROLLERS, INVESTIGATION OF PSI DROP CHECKING FOR PIG ARRIVAL AT GALLUP AND VERIFYING DRAG REDUCTION AGENT (DRA). AT 13:20, PIPELINE FIELD OPERATOR REPORTS NAVAJO DOT BACKHOE OPERATOR (BLADE OPERATOR) HAS HIT HOSPAH 6"", REQUESTS SHUTDOWN OF LINE. 13:21 HOSPAH LINE IS SHUT DOWN. AT 14:21 BLOCK VALVES EL BV 28 AND 37 ARE CLOSED. AT 14:27 PIPELINE OPERATOR IS ONSITE, SECURING SITE AND REPORTING CONDITIONS. 14:38 NATIONAL RESPONSE CENTER (NRC) IS NOTIFIED. AT 16:05 NO ONE CALL TICKET FROM NAVAJO DOT HAD BEEN RECEIVED. 16:42 WESTERN REFINING EMERGENCY ONE CALL IS RECEIVED, ALL RESPONSE PERSONNEL ARE ONSITE, CLEANUP AND REPAIR TO BEGIN WITHIN TWO HOURS OF THE EMERGENCY ONE CALL. AT 18:35, 10 BELLY DUMP TRUCKS AND 2 BACKHOES WILL BE ON SITE BY 08:00. JULY 1, 2015, 07:15 BLOCK VALVES HAD BEEN RE-OPENED, HOSPAH STATION RESTARTED. CLEANUP OPERATIONS CONTINUING TO MEET THE BUREAU OF INDIAN AFFAIRS STANDARDS.