SUNOCO PIPELINE L.P.

hazardous_liquid Incident —

Incident Information

Report Date
OperatorSUNOCO PIPELINE L.P.
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates34.81979, -97.44566

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 7/16/2015 MAYSVILLE STATION WAS DOWN FOR SCHEDULED MAINTENANCE WORK. AS PART OF THE LO/TO TO ISOLATE MAYSVILLE STATION A MLV OUTSIDE OF THE STATION WAS LO/TO'D. A MANUAL PUMP AT AN INJECTION POINT BETWEEN MAYSVILLE AND THE LO/TO'D MLV WAS TURNED ON. NORMAL FLOW FROM THIS INJECTION POINT IS EAST TO SEMINOLE. HOWEVER, THE MANUAL INJECTION PUMPED AGAINST THE CLOSED MLV WHICH CAUSED PRESSURE TO BACKUP TO MAYSVILLE STATION. THIS BACKUP CAUSED THE SUMP DRAIN LINES OF THE MAINLINE PUMPS TO OVERFLOW RELEASING <1 BARREL TO THE CONCRETE PAD WHERE THE PUMPS ARE SITUATED. THE MANUALLY OPERATED FIELD PUMP WAS SHUT DOWN RELIEVING THE PRESSURE AND THE RELEASE STOPPED. ALL FREE OIL WAS IMMEDIATELY CLEANED UP FROM THE CONRETE PAD.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in