COLONIAL PIPELINE CO

hazardous_liquid Incident —

Incident Information

Report Date
OperatorCOLONIAL PIPELINE CO
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.71897, -95.17930

Cause

CauseEXCAVATION DAMAGE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 7/24/2015 AT 14:15 A CONTRACT CREW DAMAGED A BURIED TUBING LINE DURING EXCAVATION NEAR THE LINE 02 UNIT 5 DISCHARGE VALVE INSIDE HOUSTON STATION. THE 3/8 INCH ARMOR-COATED TUBING WAS CONNECTED TO UNIT 5 CASE PRESSURE INSTRUMENTATION. THE TUBING WAS STRUCK BY A MINI EXCAVATOR AND PULLED APART, RELEASING 80 GALLONS OF DIESEL FUEL BEFORE IT WAS ISOLATED. INTERNAL NOTIFICATIONS WERE MADE AND A TECHNICIAN AND CONTRACTOR CREW WORKING AT THE SITE IMMEDIATELY STARTED CLEAN UP AND REPAIR ACTIVITIES. TEMPORARY REPAIRS WERE COMPLETED BY 15:00 AND THE LINE WAS RESTARTED AT 15:20. FINAL CLEANUP EFFORTS WERE COMPLETED BY 18:50. ALL RELEASED PRODUCT WAS CONTAINED ON COMPANY PROPERTY IN THE IMMEDIATE AREA. NO IMMEDIATE STATE, LOCAL OR FEDERAL AGENCY NOTIFICATIONS WERE REQUIRED DUE TO THE VOLUME RELEASED AND THAT IT WAS CONTAINED ON COMPANY PROPERTY. A POST-ACCIDENT DRUG AND ALCOHOL TEST WAS CONDUCTED ON THE CONTRACT OPERATOR OF THE MINI EXCAVATOR.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in