WYOMING PIPELINE COMPANY

hazardous_liquid Incident — — August 6, 2015

Incident Information

Incident DateAugust 6, 2015
OperatorWYOMING PIPELINE COMPANY
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates43.95679, -104.60316

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$2,000
Emergency Response$5,000
Other Costs$0

Location Map

Incident Narrative

CONTRACTOR WORKING FOR OIL COMPANY CALLED IN LOCATE FOR INJECTION LINE. THE LINE IN QUESTION IS A NON-OPERATIONAL GATHERING LINE. WE LOCATED THE WRONG LINE. WE GOT OFF OF OUR ROW; CONTRACTOR DUG OUT OUR LINE, BECAUSE IT WAS NOT LOCATED , DUG THROUGH OUR LINE, CAUSING SPILL. ALL PRODUCT WAS RECOVERED, CONTAMINATED SOIL COLLECTED AND PROPERLY DISPOSED OF, NEW SOIL WAS PLACED IN THE EXCAVATION.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.