WILLIAMS FIELD SERVICES

hazardous_liquid Incident — — August 6, 2015

Incident Information

Incident DateAugust 6, 2015
OperatorWILLIAMS FIELD SERVICES
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates40.45772, -104.44393

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$200,000
Emergency Response$20,000
Other Costs$0

Location Map

Incident Narrative

ON AUGUST 6, 2015 AT 14:09 PM, A THIRD-PARTY CONTRACTOR WAS EXCAVATING WITH A TRENCHING MACHINE ACROSS THE RIGHT OF WAY, STRIKING THE LUCERNE LATERAL OF THE OVERLAND PASS PIPELINE SYSTEM. THE PIPE WALL WAS PENETRATED, AND THE EQUIPMENT OPERATOR IMMEDIATELY EVACUATED. THE FUMES MIGRATED TO A TANK BATTERY AND VAPOR COMBUSTION UNIT APPROXIMATELY 200 YARDS FROM THE LOCATION OF THE STRIKE, WHICH IGNITED THE VAPOR PER EYEWITNESS ACCOUNTS. AT 15:20, WILLIAMS RECEIVED CALL FROM KERSEY COLORADO FIRE DEPARTMENT REPORTING A FIRE. AT 15:51, TWO OPPL OP/TECHS RESPONDED TO REPORTED RELEASE LOCATION. FIRE DEPARTMENT EVACUATED A 2 MILE AREA. AT 16:50, AN OP/TECH CLOSED THE BLOCK VALUE AT LUCERNE JUNCTION WHICH ISOLATED THE LUCERNE LATERAL FROM THE DJ LATERAL MAINLINE. AT 17:30, AN OP/TECH CLOSED THE LUCERNE LATERAL BLOCK VALVE, ISOLATING THE LUCERNE PLANT FROM THE LATERAL. THE FIRE CONTINUED TO BURN THROUGH THE NIGHT AND AT LOW LEVELS UNTIL AUGUST 8. ON AUGUST 9, WILLIAMS COMPLETED REPAIRS TO THE PIPELINE AND AT 15:50 THE LINE WAS RETURNED TO SERVICE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.