"HOLLY ENERGY PARTNERS - OPERATING, L.P."

hazardous_liquid Incident — — December 10, 2016

Incident Information

Incident DateDecember 10, 2016
Operator"HOLLY ENERGY PARTNERS - OPERATING, L.P."
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates32.80760, -104.44690

Cause

CauseEQUIPMENT FAILURE
SubcausePUMP OR PUMP-RELATED EQUIPMENT

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,000
Emergency Response$4,000
Other Costs$0

Location Map

Incident Narrative

"AFTER 22:00 THE CONTROL CENTER RECEIVED INTERMITTENT VAPOR MONITOR ALARMS SHOWING HIGH LEL CONCENTRATION. THE CONTROLLER SHUT DOWN THE PIPELINE, ISOLATED THE PUMP STATION, CONTACTED I & E FOREMAN WHO DISPATCHED A TECHNICIAN. IT WAS DISCOVERED THAT THE ""SEAL FAILED"" ON EL PASO 6"" PIPELINE, UNIT 2 GISSLER PUMP STATION, RELEASING AN ESTIMATED 15 GALLONS OF ISO-BUTANE THAT WAS FROZEN TO THE PUMP SKID, PUMP, AND SURROUNDING GROUND. THE ROOT CAUSE WAS DETERMINED TO BE CARBON PARTICLES THAT HAD COLLECTED BEHIND THE SEAL SPRINGS, PREVENTING THE SEAT FROM TOUCHING THE SEAL, CREATING THERMAL STRESS, AND FRACTURING THE SEAL MATERIAL. UNIT 2 WAS COMPLETELY ISOLATED, LOTO, PURGED, AND THE TECHNICIANS, REMOVED THE FAULTY SEAL. THE ""CARBON SILICON SEAL"" WAS REPLACED WITH A ""TUNGSTEN CARBIDE SEAL"" WHICH IS LESS LIKELY TO FRACTURE UNDER THERMAL STRESS. THE SURROUNDING GROUND AREA, INCLUDING PUMP & PUMP SKID WERE CLEANED, UNIT 2 WAS REASSEMBLED, CHECKED FOR LEAKS, STARTED, BROUGHT UP TO NORMAL WORKING PRESSURE. THE TECHNICIANS CONTINUED ONSITE MONITORING UNIT 2 UNTIL SATISFIED THE REPAIR WERE COMPLETE"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.