"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident — — January 12, 2017

Incident Information

Incident DateJanuary 12, 2017
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.75829, -104.81468

Cause

CauseNATURAL FORCE DAMAGE
SubcauseTEMPERATURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$5,000
Emergency Response$60,000
Other Costs$0

Location Map

Incident Narrative

"TANK 108 ROOF DRAIN WAS OPENED TO DRAIN WATER FROM THE ROOF. THE OPERATION WAS CHECKED THROUGHOUT THE SHIFT, BUT A SMALL AMOUNT OF GASOLINE WAS OBSERVED COMING FROM THE VALVE WITH THE FINAL CHECK OF THE DAY. THE VALVE WAS CLOSED AND ABSORBENTS USED TO COLLECT GASOLINE THAT WAS RELEASED INSIDE THE TANK CONTAINMENT. IMPACTED ABSORBENTS WERE PROPERLY CONTAINED FOR DISPOSAL. MINOR AMOUNTS OF SURFACE SOIL COLLECTED AND PLACED IN DRUMS FOR DISPOSAL. ONCE THE TANK WAS REMOVED FROM SERVICE AND CLEANED IT WAS DETERMINED THAT THE ROOF DRAIN SYSTEM HAD ACCUMULATED ICE. THE FLEXIBLE JOINT CONNECTION INTERNAL TO THE TANK HAD BEEN DAMAGED WHICH ALLOWED PRODUCT TO ENTER THE ROOF DRAIN SYSTEM. THIS STYLE FLEXIBLE JOINT CONNECTION FOR INTERNAL ROOF DRAIN SYSTEM ON EXTERNAL FLOATING ROOFS (EFR) IS NO LONGER AN APPROVED INSTALLATION. MAGELLAN HAS ALSO PREPARED A LESSON LEARNED BULLETIN (LLB) TO BE DISTRIBUTED ACROSS OPERATIONS FOR PROPER WINTERIZATION OF EFR ROOF DRAINS. THE LLB WILL PROVIDE GUIDANCE TO MODIFY SITE SPECIFIC WINTERIZATION PROCEDURES. APPROXIMATELY 20 CUBIC YARDS OF SOIL WAS REMEDIATED SUPPLEMENTAL UPDATE: PART H NARRATIVE"

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in