"BUCKEYE PARTNERS, LP"

hazardous_liquid Incident — — April 24, 2017

Incident Information

Incident DateApril 24, 2017
Operator"BUCKEYE PARTNERS, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates39.71265, -89.25084

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$1,000
Emergency Response$4,000
Other Costs$0

Location Map

Incident Narrative

"DURING A STATION CHECK, THE INBOUND PIG TRAP DOOR WAS FOUND TO BE LEAKING. THE PIG TRAP WAS ISOLATED AND LOCKED OUT. ALL REQUIRED NOTIFICATIONS WERE MADE. IT WAS DETERMINED THAT A GASKET WAS LEAKING. OPERATIONS ADDRESSED DOOR GASKET ISSUE. 10 DRUMS OF CONTAMINATED SOIL WAS REMOVED."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.