GLASS MOUNTAIN PIPELINE

hazardous_liquid Incident —

Incident Information

Report Date
OperatorGLASS MOUNTAIN PIPELINE
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates36.27374, -99.19176

Cause

CauseOTHER ACCIDENT CAUSE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

THE MAINLINE PUMP UNIT WAS INSTALLED ON 1/26/16. THIS PUMP WAS RECEIVED WITH A MISSING 3/8"" PIPE PLUG. THE MISSING PLUG WAS NOT IDENTIFIED DURING THE INSTALLATION. AS A RESULT, THE 20 BBL SPILL OCCURRED CAUSING SOIL CONTAMINATION AT THE STATION SITE AND ADJACENT PROPERTY ACTION: DEVELOP A START-UP CHECKLIST FOR PUMPS TO BE IMPLEMENTED THROUGH THE ROSE ROCK, WHITE CLIFFS AND GLASS MOUNTAIN PIPELINE OPERATIONS. SUBMITTED CORRECTED SUPPLEMENTAL TO ACCURATELY REFLECT LOCATION OF THE ACCIDENT. GPS WAS UPDATED ON 02/01/2017

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in