NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.

hazardous_liquid Incident — — March 10, 2016

Incident Information

Incident DateMarch 10, 2016
OperatorNUSTAR PIPELINE OPERATING PARTNERSHIP L.P.
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates41.18714, -91.70938

Cause

CauseEQUIPMENT FAILURE
SubcauseNON-THREADED CONNECTION FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$4,500
Emergency Response$200
Other Costs$0

Location Map

Incident Narrative

AT 20:22 THURSDAY MARCH 10, 2016 THE CONTROL CENTER WAS NOTIFIED BY THE WASHINGTON COUNTY SHERIFF'S DEPARTMENT ABOUT AN AMMONIA ODOR NEAR VALVE 6-8 NEAR THE TOWN OF COPPOCK, IA. NUSTAR EMPLOYEE RESPONDED AND VERIFIED SMELL OF AMMONIA, BUT NO VISUAL SIGN. ON MARCH 11, 2016 NUSTAR MAINTENANCE CREW MOBILIZED TO THE SITE, UNCOVERED THE STOPPLE TEE, AND FOUND ONE SEGMENT PLUG O-RING LEAKING. THE LEAK WAS VERIFIED AT 10:43 BY CAPTURING A QUANTITY OF AMMONIA IN A PERIOD OF TIME AND WAS CALCULATED AT 376 POUNDS IN A 24 HOUR PERIOD WHICH EQUATES TO 73 GALLONS. THE NRC WAS NOTIFIED (REPORT # 1142567) AS WELL AS IA DNR (REPORT # 031116-MRH-1413). CORRESPONDENCE WITH PHMSA IS ONGOING. ALL FOUR SEGMENT PLUGS WERE BACK WELDED AND SEALED. THE SITE WAS VISITED BY IA DNR AND THE INSPECTOR WAS SATISFIED WITH OUR RESPONSE. **UPDATE** - ON 10/25/2016 THE CONTAMINATED SOILS WERE REMOVED FROM THE VALVE SITE AND FRESH DIRT WAS REPLACED. PER IDNR THE SOIL IS BEING LAND FARMED AT HOUGHTON STATION. TOTAL AMOUNT OF SOIL REMOVED WAS 72 CUBIC YARDS (8 LOADS) AND 81 CUBIC YARDS (9 LOADS) WERE BROUGHT IN.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in