ENBRIDGE STORAGE (CUSHING) L.L.C.
hazardous_liquid Incident — — March 29, 2016
Incident Information
| Incident Date | March 29, 2016 |
| Operator | ENBRIDGE STORAGE (CUSHING) L.L.C. |
| Commodity | CRUDE OIL |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 35.95837, -96.75406 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | THREADED CONNECTION/COUPLING FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $500 |
| Emergency Response | $5,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
ON MARCH 29, 2016 AT 8:30 AM AFTER RETURNING TO THE JOB SITE AFTER THE HOLIDAY WEEKEND, THE PROJECT INSPECTOR DISCOVERED THAT A THREADED COLLAR ON THE 2"" DEAD-LEG DRAIN LINE HAD LEAKED UNDER THE PIPE INTO THE DITCH AREA. THE RELEASE WAS ESTIMATED AT 2.6 BARRELS. THE RELEASE WAS FULLY CONTAINED ON-SITE AND WITHIN THE DITCH AREA. AS AN INTERIM SOLUTION TO STOP FURTHER RELEASE OF PRODUCT, A TEMPORARY CLAMP WAS PUT ON THE PIPING AND COLLAR ON MARCH 29, 2016. THE DEAD-LEG PIPING SEGMENT WAS FULLY REMOVED ON MARCH 30, 2016 AS A PERMANENT SOLUTION. ALL CLEAN-UP AND RESTORATION EFFORTS WERE COMPLETED ON APRIL 1, 2016. CONTAMINATED SOIL WAS DISPOSED OF AT A DESIGNATED DISPOSAL FACILITY. THE INVESTIGATION DETERMINED THE ROOT CAUSE OF THE DEAD-LEG 2"" DRAIN LINE RELEASE WAS CAUSED BY THE LACK OF CRIBBING OR SUPPORTS ON THE DRAIN LINE AFTER SOIL REMOVAL. THE LACK OF SUPPORT CAUSED THE 2"" DEAD-LEG PIPING TO EVENTUALLY SAG AT THE 2"" COLLAR RESULTING IN PRODUCT RELEASE FROM THE COLLAR PIPING THREADS.