COLONIAL PIPELINE CO
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | COLONIAL PIPELINE CO |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 33.24230, -86.91827 |
Cause
| Cause | OTHER ACCIDENT CAUSE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON 09/09/16 AT 11:10 CST THE COLONIAL PIPELINE CONTROL CENTER WAS NOTIFIED OF A SUSPECTED LEAK IN SHELBY COUNTY, AL (APPROXIMATELY 9 MILES UPSTREAM OF PELHAM STATION). THE CONTROL CENTER REPORTED SHUTDOWN AND REMOTE ISOLATION OF THE SEGMENT AT 11:30. AT 11:20 LOCAL ROW PERSONNEL WERE DISPATCHED TO INVESTIGATE. AT 12:14 FIELD OBSERVERS CONFIRMED A RELEASE OF GASOLINE. NRC WAS NOTIFIED AT 12:59 VIA REPORT #1158584. ADEM, COUNTY EMA AND LOCAL FIRE DEPARTMENTS WERE SUBSEQUENTLY NOTIFIED AND A UNIFIED COMMAND SYSTEM STRUCTURE WAS IMPLEMENTED. SUBSEQUENT NRC REPORTS WERE MADE AS FOLLOWS: 9/09/16 23:13 - #1158628 UPDATE TO 1,000 BBLS 9/13/16 18:58 - #1158929 UPDATE TO 6,000 BBLS ON 01/27/17 DNV GL SUBMITTED THE ROOT CAUSE FAILURE ANALYSIS REPORT TO COLONIAL. THE REPORT STATED THAT ""A WRINKLE OCCURRED IN THE PIPE EXTENDING APPROXIMATELY 180 DEGREES FROM THE 9 O'CLOCK TO 3 O'CLOCK POSITION. A CIRCUMFERENTIAL CRACK OF APPROXIMATELY 1-1.5 INCHES WAS PRESENT AT APPROXIMATELY THE 12 O'CLOCK POSITION AT THE WRINKLE PATH. THE WRINKLE WAS CAUSED BY ""INADEQUATE SOIL CONSOLIDATION UNDER LINE 01 FOLLOWING MAINTENANCE/RECOAT ACTIVITIES IN 2015."" UPDATE 2/14/18: SOIL MASS BALANCE FOR THE CR91 RELEASE WAS CALCULATED USING LANDFILL WEIGHT TICKETS AND AN AVERAGE OF THE TPH GRO FROM STOCKPILE SAMPLES. THE TPH GRO AVERAGE WAS 278.5 MG/KG AND THE SOIL WEIGHT WAS 13942 TONS. USING THE WORKSHEET, TOTAL VOLUME OF PRODUCT IN SOIL WAS CALCULATED TO BE 1,275 GALLONS. ALL SOIL WAS DISPOSED OF AT A LANDFILL WITH DISPOSAL APPROVAL BY ADEM. ANY FUTURE, LONG-TERM REMEDIATION WILL BE CONDUCTED UNDER THE GUIDNACE OF ADEM.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.