KINDER MORGAN CO2 CO. LP

hazardous_liquid Incident — — September 17, 2016

Incident Information

Incident DateSeptember 17, 2016
OperatorKINDER MORGAN CO2 CO. LP
CommodityCO2 (CARBON DIOXIDE)
Pipeline Typehazardous_liquid

Location

State
Coordinates35.74167, -107.13789

Cause

CauseINCORRECT OPERATION
SubcauseEQUIPMENT NOT INSTALLED PROPERLY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$4,213
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

ON 9/17/16, A KINDER MORGAN CONTRACTOR DISCOVERED A LEAK AT TORREON STATION ON THE THREADS OF A 1/2"" PLUG ON THE 24"" BLIND FLANGE. THE AREA WAS ISOLATED, AND ATTEMPTS WERE MADE TO FURTHER TIGHTEN THE PLUG TO STOP THE LEAK. THE PLUG WAS TIGHT, AND ACTIONS WERE CEASED AS TO NOT CAUSE DAMAGE TO THE PLUG OR THREADS. A 2ND PARTY CONTRACTOR DRILLED AND INSTALLED AN INJECTION FITTING ONTO THE 1/2"" PLUG. TEFLON SEALANT WAS INJECTED INTO THE 1/2"" PLUG TO STOP THE LEAK.