DCP MIDSTREAM

hazardous_liquid Incident —

Incident Information

Report Date
OperatorDCP MIDSTREAM
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.50214, -100.58349

Cause

CauseOTHER ACCIDENT CAUSE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

SONORA PUMP STATION, PUMP CASES WERE SWAPPED OUT TO INCREASE THE FLOWS THROUGH THE SITE. A SPARE PUMP CASE WAS SENT TO SPX TO BE UPGRADED TO A HIGH FLOW BUNDLE, AND THEN TRANSPORTED TO THE SONORA PUMP STATION. THE ROOF WAS REMOVED TO FACILITATE THE REMOVAL OF PUMP P101. P101 WAS SHUT DOWN, LOCKED OUT AND VENTED DOWN FOR THE PUMP CASE SWAP. THIS EVENT WAS INADVERTENTLY REPORTED. DCP IS REQUIRED TO NOTIFY THE NRC ABOUT RELEASES GREATER THAN 5 BBLS RESULTING FROM A PIPELINE MAINTENANCE ACTIVITY. HOWEVER, THE 26.42 BBLS THAT WERE REPORTED WERE NOT RELEASED TO THE ATMOSPHERE, BUT RATHER WAS FLARED OFF ONSITE, THEREFORE NO NOTIFICATION TO THE NRC WAS REQUIRED.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in